MIGRATION BATON / ORDERED LINE

NO
SKIPPED
STOPS.

A state migration moves only when the current checkpoint is proven and the frozen rollback anchor remains intact.

Control line

BATON
PPLANNED
1CHECKPOINT 01
2CHECKPOINT 02
3CHECKPOINT 03
✓COMPLETED
↶ROLLBACK

STUDIONET CONTRACT LIVE · READY FOR WALLET

Load a migration to place the baton.
ROUTE DISPATCH

Lay the line.

ATTACH THE ROLLBACK ANCHOR
NEXT NON-SKIPPABLE STOP

Hand over the baton.

ATTACH THIS STATION'S PUBLIC PROOF
RECOVERY SIDING

Return to the anchor.