MIGRATION BATON / ORDERED LINE

NO
SKIPPED
STOPS.

A state migration moves only when the current checkpoint is proven and the frozen rollback anchor remains intact.

Control line

BATON
PPLANNED
1CHECKPOINT 01
2CHECKPOINT 02
3CHECKPOINT 03
COMPLETED
ROLLBACK

STUDIONET CONTRACT LIVE · READY FOR WALLET

Load a migration to place the baton.
ROUTE DISPATCH

Lay the line.

ATTACH THE ROLLBACK ANCHOR
NEXT NON-SKIPPABLE STOP

Hand over the baton.

ATTACH THIS STATION'S PUBLIC PROOF
RECOVERY SIDING

Return to the anchor.